Comprehensive Environmental Support for Major Nevada Mining Operations
Spheros Environmental provides comprehensive, environmental support throughout all phases of the mine lifecycle. Regulatory support for multiple large-scale, confidential mining…
Spheros Environmental provides comprehensive, environmental support throughout all phases of the mine lifecycle. Regulatory support for multiple large-scale, confidential mining…
The Silver Springs Data Centers and Scorpio Gas Power Plant project represents a first-of-its-kind development on Bureau of Land Management…
The Libra Solar Project is a large-scale renewable energy development consisting of a 700-megawatt solar photovoltaic facility, battery energy storage…
Following the passage of Measure C in 2020, the Marin Wildfire Prevention Authority (MWPA) was established to fund and oversee…
The Marin Municipal Water District sought to improve long-term drought resilience by capturing and conveying water from atmospheric river events…
Spheros Environmental conducted toxicological evaluations of sediments, soils, and site waters as part of a Baseline Ecological Risk Assessment (BERA) for cleanup efforts under CERCLA at a former smelter…
Spheros Environmental conducted toxicological evaluations of marine sediments as part of a remedial investigation for cleanup efforts at the Blakely…
In support of upcoming maintenance dredging, the potential dredged material required characterization to determine whether it was suitable for open ocean disposal under Section 103 of…
Covia needed to expand rail infrastructure at one of the largest silica mines in the United States to increase production…
The U.S. Bureau of Reclamation’s Northern California Area Office (NCAO) manages critical water resource infrastructure, including major dams, hatcheries, and…
The Trinity River Restoration Program is a congressionally mandated multi-decade effort led by the U.S. Bureau of Reclamation in collaboration…
Development of the 550-MW Desert Sunlight Solar Farm required construction of a large-scale photovoltaic facility and more than 12 miles…